Curtain wall is the exterior wall enclosure of a building, which does not bear weight and is hung like a curtain, so it is also called "curtain wall". It is a light wall with decorative effect commonly used in modern large and high-rise buildings.
Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
Contact Now
In simple terms, steel structure is actually a kind of structure composed of different steel materials through a certain connection. Mixing different types of materials can effectively improve the overall performance of steel structure. With the continuous progress of science and technology, steel structure has been widely used in engineering projects, so as to effectively display its performance advantages. For example, high-rise buildings make full use of the characteristics of strong steel structure to effectively improve the quality of construction engineering.
Contact Now
Basic InstructionShandong GuoShun International trade co., ltd. AND Afghan ARYANA NAWEEN BERADRAN CONSTRUCTION AND ROAD BUILDING COMPANY AFN ACCT signed a contract for the steel structure Bridges on June 22, 2018.
Contact Now
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
Contact Now
H-section steel is a kind of economic section high-efficiency profile with more optimized section area distribution and more reasonable strength weight ratio. It is named after its section is the same as the English letter "H". Since all parts of H-shaped steel are arranged at right angles, H-shaped steel has been widely used for its advantages of strong bending resistance, simple construction, cost saving and light structure weight in all directions.
Contact Now
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!Under Construction
Contact Now
Basic InstructionWe have a sound system of qualifications, the existing steel structure engineering contracting qualification (Level I), steel structure manufacturing and installation qualification (Level I), light steel structure engineering design qualification (Grade A), mechanical and electrical construction general contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in total with 20 qualifications.Steel construction projectAustralia steel bridgeTanzania steel bridge
Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
Contact Now
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
Contact Now
Basic InstructionIt's far stated that because september 2021, the low-carbon generation manipulate crew of beijing university of technology has taken the lead and cooperated with eight devices, which incorporates the countrywide speed skating hall, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon funding generation co., ltd., beijing green trade co., ltd.
Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
Contact Now
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of five meters,forty-4 meters of it had been blown up all through the preventing.
Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,40-4 meters of it were blown up at some point of the preventing.
Contact Now