Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe complete process supervision and inspection of the assignment changed into completed with the aid of the international well-known bureau veritas. the layout, production and full assembly offerings of guoshun organization had been evaluated as "very glad" by using the owner icafal ingenier í a y constructi ó n s.a. (the 6th largest standard contractor in chile and rated because the countrywide champion of chilean creation sustainable development business enterprise through the chilean residence of representatives).Site Display
Contact Now
IntroduceMetallic shape platform is a structural platform composed of metal cloth, that's one of the number one forms of building structure of the platform.the form is especially composed of steel beam, metallic column, metallic truss and one-of-a-kind additives made from type steel and metal plate, and adopts silanization, natural manganese phosphorization, washing and drying, galvanizing and one-of-a-kind rust removal and rust prevention era.welds, bolts or rivets are typically used among the people or additives.due to its mild weight and easy creation, it's miles widely used in plat
Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warmness change performance, small heat loss, compact and light-weight shape, small ground vicinity, wide software and lengthy service lifestyles.
Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmth change overall performance, small warmth loss, compact and light-weight form, small floor vicinity, huge software and prolonged service lifestyles.
Contact Now
Composite wear-resistant plate has the characteristics of high wear resistance, impact resistance and easy processing. It can be connected with other structural parts by welding, plug welding and bolt connection. It is widely used in ports, docks, metallurgy, cement, coal, power, mines, steel, building materials, bricks and other industries.
Contact Now
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
Contact Now
InstructionFlue gas desulfurization and denitration generation is a boiler flue gasoline purification technology completed to the chemical industry of multi nitrogen oxide and sulfur oxide technology. nitrogen oxides and sulfur oxides are one of the foremost property of air pollutants. therefore, the software of this era has many benefits for ambient air purification.
Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
Contact Now
Basic InstructionDart is a public transportation system based totally on public transportation. it connects the suburb of dar es salaam with the important agency district. the middle started out out operation in may 2016. the primary phase of manufacturing became finished in december 2015, with a complete price of 159.6 million euros, funded thru the african improvement financial institution, the arena monetary organization and the tanzanian authorities.
Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
Contact Now
Basic InstructionRonald lwakatare, chief executive of Tanzania's rapid transit authority, said they had received $148.1 million for phase III and $99.9 million for phase IV. "The funds obtained will contribute to the actual construction of BRT infrastructure, and the government will be responsible for compensating people who will be affected by the project," he said.
Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani. Construction Process
Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
Contact Now
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
Contact Now
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
Contact Now
Basic InstructionAccording to the relevant person in charge of the South extension project of Shunhe expressway, the South extension of Shunhe expressway will realize multi-level and full coverage of BRT + rail transit + ordinary bus + tourist bus, maximize the high-quality road resources, tilt to slow and public transport, make public transport travel more convenient, give priority to public transport signals, implement green wave traffic, intelligent monitoring of the whole line, and use information technology to improve traffic management level and travel service level.
Contact Now
IntroducePlate heat exchanger has the characteristics of high heat exchange efficiency, small heat loss, compact and lightweight structure, small floor area, wide application and long service life.
Contact Now